Improve resource utilization and simplify management.
BTG SOLUTION
Virtualization and backup

01
Customer needs addressed
The architecture is shaped around the customer’s objectives, constraints and operating model.
Protect workloads and backups from a single point of failure.
Define realistic RPO and RTO for different services.
02
Solution scope
The exact scope is defined after assessment and agreement on project boundaries.
Virtualization clusters, networking, storage and centralized management.
Backup policies based on data and service criticality.
Separate repositories, immutable copies and controlled access.
Regular recovery tests, monitoring and operating documentation.
03
Project stages
Assessment
We collect inputs, requirements and constraints.
Architecture
We prepare the target design, scope and delivery plan.
Pilot
We validate critical assumptions in an agreed environment.
Implementation
We supply, configure, integrate and test.
Handover
We document the result and hand it over for operation.
04
Support and development
After commissioning, BTG can support agreed components and assist with diagnostics, changes, updates and architecture development. Terms, scope and response arrangements are defined separately for each project.
- Financial organizations
- Public sector
- Industry and energy
- Enterprise and distributed organizations
We work on projects in Almaty and other regions of Kazakhstan. Assessment, supply, implementation and on-site formats are agreed with the customer’s locations.
05 / Anonymized example
Virtualization and backup
Critical systems may use more frequent backups and node resilience, while archives use different retention and media. Policy is based on service criticality rather than one setting for the entire environment.
The example describes a typical approach and does not disclose customer information.07
Frequently asked questions
How is high availability different from backup?
High availability reduces downtime after failure; backup restores data after deletion, corruption or attack.
What are RPO and RTO?
RPO defines acceptable data loss in time; RTO defines acceptable service recovery time.
Is a successful backup job status enough?
No. Integrity checks and regular recovery tests are required.