← Capability overview

BTG SOLUTION

Data center design and implementation

Data center and server room design for your IT workload: rack layout, electrical power, uninterruptible power supplies (UPS), cooling and monitoring.
Send a request →
BTGBTG

01

Customer needs addressed

The architecture is shaped around the customer’s objectives, constraints and operating model.

01

Align IT load with the site engineering infrastructure.

02

Provide required redundancy without unnecessary complexity.

03

Enable safe operation and controlled growth.

02

Solution scope

The exact scope is defined after assessment and agreement on project boundaries.

01

Site assessment, load calculations and layout design.

02

Power, UPS, distribution, grounding and backup sources.

03

Cooling, airflow, racks, raised floors and cable routes.

04

Monitoring, fire safety, access control and documentation.

03

Project stages

01

Assessment

We collect inputs, requirements and constraints.

02

Architecture

We prepare the target design, scope and delivery plan.

03

Pilot

We validate critical assumptions in an agreed environment.

04

Implementation

We supply, configure, integrate and test.

05

Handover

We document the result and hand it over for operation.

04

Support and development

After commissioning, BTG can support agreed components and assist with diagnostics, changes, updates and architecture development. Terms, scope and response arrangements are defined separately for each project.

  • Financial organizations
  • Public sector
  • Industry and energy
  • Enterprise and distributed organizations

We work on projects in Almaty and other regions of Kazakhstan. Assessment, supply, implementation and on-site formats are agreed with the customer’s locations.

05 / Anonymized example

Data center design

Modernizing an operating server room starts with measurements of IT and heat load and a review of power and space constraints. Phased implementation supports equipment migration and new-system commissioning with controlled operational risk.

The example describes a typical approach and does not disclose customer information.

07

Frequently asked questions

Where does a data center project begin?

With requirements for IT load, availability, site conditions, growth and operation.

Can an operating server room be modernized?

Yes, but the design must account for phasing, temporary arrangements and approved work windows.

What is handed over at completion?

Deliverables depend on the project and include agreed diagrams, settings, test results and operating materials.

BTG / ALMATY / KAZAKHSTAN

Discuss the task with BTG

Describe the current environment, task and expected result. The BTG team will suggest a practical next step without unsupported promises on timing or outcomes.
Send a request →+7 706 700 4835info@btgroup.kz